GE Surface Specialty Wellheads Broschüre

Stöbern Sie online oder laden Sie Broschüre nach Nein GE Surface Specialty Wellheads herunter. GE Surface Specialty Wellheads Brochure Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 1
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
GE Oil & Gas
Specialty Wellheads
Close-Proximity Wellhead (CPW) Systems
Close-proximity wellhead systems enable two or more
wellbores to be placed within a single conductor or caisson
with production through adjacent independent wellhead
systems. Each CPW system is customized to meet specic
criteria supplied by our clients.
Platforms with available slots are often seen as the rst
candidates for incorporating a CPW. When combined with
3D seismic, extended-reach drilling, horizontal drilling and
multilateral completions, a few well-placed additional
completions can have a dramatic positive eect on eld
production economics.
Additional benets can be derived by reducing the overall
height and size of new structures or by eliminating the need
for additional structures to develop existing elds.
Features —
When compared to systems with multiple strings of casing
or tubing suspended in a single wellhead component,
completely independent adjacent wellhead systems:
Allow the use of smaller BOP stacks,
Eliminate communication between wellbores, and
Allow easier workover or repair.
Whenever possible, minimum clearance wellhead
equipment connector technology is included.
Conventional or multi-bowl wellhead options are available.
Pressure ratings up to 15,000 psi can be accommodated.
Field-proven designs have been used on projects involving
2, 3, 5, 6, 11, and 12 close proximity wells with inside
casing and conductor strings ranging from 13-3/8” to 120”.
Experience —
Angola - 2 in a leg
Egypt - 2 in a leg
Main Pass - 3, 11 and 12 in a leg
North Sea - 2 and 3 in a leg
Qatar - 8 and 12 in a leg
South Pass 40 - 6 in a leg
Trinidad - 2 in a leg
West Cameron 294 - 4 in a leg
GE © 2014. All rights reserved.
03/14, PC #14-0091
geoilandgas.com/pressurecontrol
Seitenansicht 0
1

Inhaltsverzeichnis

Seite 1 - Specialty Wellheads

GE Oil & GasSpecialty WellheadsClose-Proximity Wellhead (CPW) SystemsClose-proximity wellhead systems enable two or more wellbores to be placed wi

Kommentare zu diesen Handbüchern

Keine Kommentare