GE GDT226SSLSS Installationshandbuch Seite 5

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 36
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 4
5
WATER LINE CONNECTION
If using a flexible braided supply hose, label the
hose with the installation date to use as reference.
Flexible braided hoses, elbows and gaskets should
be replaced in 5 years.
• Turn off the water supply.
Install a hand shut-off valve in an accessible location,
such as under the sink. (Optional, but strongly
recommended and may be required by local codes.)
Water connection is on the left side of the dishwasher.
Install the hot water inlet line, using no less than 3/8”
copper tubing or a flexible braided hose. Route the
line as shown in PREPARE HOT WATER LINE and
extend forward at least 19” from rear wall.
Adjust water heater for 120°F to 140°F temperature.
Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.
Installation Preparation
PREPARE HOT WATER LINE
NOTE: GE Appliances recommends copper tubing for
the water line, but if you choose to use flexible hose,
use GE Appliances WX28X326, flexible braided hose.
The water supply line (3/8” copper tubing or flexible
braided hose) may enter from either side, rear or
floor within the shaded area shown in the figure.
• The water supply line may pass through the same
hole as the electrical cable and drain hose. Or, cut an
additional 1-1/2" diameter hole to accommodate the
water line. If power cord with plug is used, water line
must not pass through power cord hole.
6"
3"
Cabinet Face
Shut-off
Valve
3" From Floor
15" From Wall
5"
From
Cabinet
Hot
1-1/2”
Dia.
Hole
PREPARATION
Locate the items in the installation packages:
Screws
Drain hose extension
Mounting brackets
Literature, product samples and/or coupons
Turn page to begin dishwasher installation.
Seitenansicht 4
1 2 3 4 5 6 7 8 9 10 ... 35 36

Kommentare zu diesen Handbüchern

Keine Kommentare