
1 2
Rod Mount Kit
OPTION B
Attach all rod mount brackets to xture end plates
using screws and lock washers supplied in the Rod
Mount Kit.
Secure 3/8” threaded rods into structural members in the
ceiling. Place a nut on each threaded rod where xture
should hang. Slide xture onto threaded rods, and place
second nut on to threaded rods to secure xture in place.
Assure that the xture is secure and cannot come free of
mounting means.
Materials Required:
• 3/8” threaded rod (Qty. 2)
• 3/8” nuts (Qty. 4)
• Rod Mount Kit
Cable or Chain
OPTION A
1
2
Hang two chains/cables (rated to support a minimum load of 80 lbs.) from a structural member of the ceiling. Fixture must be
supported independently of an outlet box.
Attach chain or cable to mounting holes on the end plates at both ends of the
xture. Assure that the xture is secure and cannot come free of mounting means.
ALB008-030714
GE Lighting • 1-888-MY-GE-LED (1-888-69-43-533) • www.gelighting.com
The GE brand, logo, and Albeo are trademarks of the General Electric Company.
© 2014 GE Lighting, LLC. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory
conditions.
Attach to
structural member
Attach to
structural member
Attach to
structural member
Fasten
with nuts
Mounting Options
Please follow all UL, NEC and minimum load rating guidelines when selecting and installing a chain, cable or rod.
NOTE: When selecting chain, a joint in a
circular chain link shall be welded. A joint
in a chain link of another shape shall
not be located within 30 degrees of the
vertical unless welded.
Kommentare zu diesen Handbüchern