GE E2SA Installationsanleitung Seite 3

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 2
Open fixture by unlocking two latches. Keep one
latch hooked onto the housing ear to suspend the
light engine.
UL Units:
Terminals are readily accessible on terminal board
and will accept service leads ranging in size from
AWG No. 16 through No. 6.
Service leads (See fixture labeling for supply wire
temperature rating) should extend through mounting
bracket approximately 7 inches.
Attach service leads to terminal board as shown on
luminaire nameplate.
See table below for screw torques (See Table 1).
A wiring diagram is provided on a label in luminaire.
NOTE: Make all electrical connections in accordance with
the National Electrical Code and any applicable local code
requirements including grounding.
NOTE: Verify that supply voltage is correct by comparing
it to nameplate.
WIRING
4
CAUTION
Risk of Burn: Allow light engine/fixture to cool before handling.
TABLE 1.
Terminal Board Torque Table UL Units:
Wire Range Copper Aluminum Torque (in lbs)
10-16 30
8-6 SOL,STR STR6,SOL,STR 45
Terminal Board Connections:
(See Figure 3.)
Terminal Board Positions Supply Type
L1 High Line
G Ground
N/L2 Line/Neutral
Rotate the light engine into position and secure by
snapping two latches on light engine to “ears” on
hood. (See Figure 4)
Figure 3
Figure 4
Tether
Ear
Latch
Wire
Seitenansicht 2
1 2 3 4 5 6 7 8 ... 11 12

Kommentare zu diesen Handbüchern

Keine Kommentare