Many
Manuals
search
Kategorien
Marken
Startseite
GE
Hardware
HC HP
Bedienungsanleitung
Ge HC HP Bedienungsanleitung Seite 2
Herunterladen
Teilen
Teilen
Zu meinen Handbüchern hinzufügen
Drucken
Seite
/
114
Inhaltsverzeichnis
LESEZEICHEN
Bewertet
.
/ 5. Basierend auf
Kundenbewertungen
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
1
2
3
4
5
6
7
...
113
114
Intrepid-HC HP
1
Table of Contents
3
CLASS 1 LASER PRODUCT
4
子信息品有毒有害物申明
5
Chapter 1: Installation
7
GE MDS Intrepid-HC HP RFU
8
1+0/1+1 Installation
10
Assembling the Hanger Kit
12
Four Screws
13
Fastening the
13
Pole Mount Kit
13
RFU Cable Connections
17
2+2 XPIC Installation
18
Installation Components
19
Installation Procedure
19
N+1 Split Mount Installation
22
1+0 Configuration
25
1+0 SD Configuration
25
1+1 HSB Configuration
26
1+1 SD Configuration
26
1+1 FD Configuration
27
1+1 FD/SD Configuration
27
1+1 SD BBS Configuration
28
2+0 DP Configuration
29
2+0 SD DP Configuration
29
2+0 SP Configuration
30
2+0 SD SP Configuration
30
2+2 Hot Standby Dual Pole
31
2+2 HSB SP Configuration
32
2+2 SD DP Configuration
33
2+2 SD SP Configuration
34
2+2 FD SP Configuration
35
2+2 HSB FD DP Configuration
36
2+2 SD/FD DP Configuration
37
4+1 FD DP Configuration
38
5+1 FD DP Configuration
39
4+1 FD SD DP Configuration
40
5+1 FD SD DP Configuration
41
Defining IP Addresses
45
To define IP Addresses:
46
NMS PC Requirements
47
Starting the NMS
48
External Alarms Setup
54
Exiting the NMS
55
##*3 floorshelfIPbaseIP ++=
58
shelves. The subnet is not
59
Connecting Line Interfaces
74
Procedures
75
Site Acceptance Procedure
76
1+0 Commissioning Procedure
81
Management Verification
82
Loopback Operation
82
1+1 Commissioning Procedure
83
Switching Tests
84
XPIC Installation Guidelines
86
XPIC Commissioning Tests
87
XPIC Recovery Verification
88
2+2 Verification
88
3-15
89
3-17
91
Protection Connector Pin-Out
95
8 x E1/T1 Connector Pin-Out
95
E1/T1 Connector Pin-Out
97
10BaseT Connector Pin-Out
97
Configuring PPP
99
General
101
Frequency Channels
101
6H GHz (6.45-7.1 GHz)
104
7 GHz (7.1-7.9 GHz)
105
ITU-R 385-7 [0]
107
8 GHz (7.8-8.5 GHz)
111
IN CASE OF DIFFICULTY
113
Kommentare zu diesen Handbüchern
Keine Kommentare
Publish
Verwandte Produkte und Handbücher für Hardware Ge HC HP
Hardware Ge GEFanuc Automation Programmable Control Products T Bedienungsanleitung
(268 Seiten)
Hardware Ge JGBS23BEL Bedienungsanleitung
(2 Seiten)
Hardware Ge ZBD6905 Bedienungsanleitung
(16 Seiten)
Hardware Ge ZET1 Bedienungsanleitung
(44 Seiten)
Dokument drucken
Seite drucken 2
Kommentare zu diesen Handbüchern