GE PV977NSS Bedienerhandbuch Seite 17

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 60
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 16
17
Installation Instructions
STEP 5 INSTALL UPPER VERTICAL
SUPPORTS TO HOOD ASSEMBLY
• Determine how much of the upper vertical
supports will need to be above the lower supports
to accomplish the frame height determined in
step 4 for this installation.
• Using screws provided, attach the 4 upper vertical
supports to the lower vertical supports at the
position determined for frame height. The upper
vertical supports are mounted to the outside
of the lower supports.
STEP 4 DETERMINE FRAME HEIGHT
•Measure exact
ceiling height.
Find the exact
frame height
required
on the chart
on page 12.
Use this formula
to determine
your frame
height:
A-(B+C+D) =
Frame height E where
A is the ceiling height,
B is the countertop
height, C is the height
determined by the
chart on page 12, D
is the height of the
hood measured from
the straight bottom
portion to the top
at the center.
24" Min.*
30" Max.*
36" Min.
Frame
height
2-3/8"
Ceiling
height
E
E
A
B
D
C
*See Chart on page 12.
Seitenansicht 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 59 60

Kommentare zu diesen Handbüchern

Keine Kommentare