Please check the contents before installation
1. LED Path Light
2. 2 screws and 2 Anchors
INSTALLATION
Before you mount your LED Path Light
1. Remove the LED Path Light back cover by loosening the
screws on the back.
2. Insert 4 NEW “AA” batteries, making sure the polarity
matches.. Do not put the back on until you have gone through
the mounting section of the User’s Manual.
NOTE: Please use only new alkaline or lithium batteries. Do
not mix old with new batteries. Make sure that the polarity
matches.
1.
2.
Kommentare zu diesen Handbüchern