1InstallationInstructionsmonogram.com42" Island Vent HoodZV1050
10Installation Instructions STEP 2 REMOVE THE PACKAGINGThe vent hood is packed separately from the decorative duct cover or accessory covers ZX1059S
11 STEP 4 MOUNT TEMPLATE• Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly, with the
12Installation Instructions STEP 6 SECURE WIRING• Route house wiring through the ceiling hole and pull a length to reach the hood junction box, app
13Installation InstructionsSTEP 8 INSTALL DECORATIVE DUCT COVERS• Pretapordrivedecorativescrewintothescrew holes on the support frame. This w
14Installation Instructions STEP 10 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If house wiring is not 2-wire with a gro
15Installation Instructions STEP 12 INSTALL FILTERS, FINALIZE INSTALLATION• Remove protective lm on the lters.• Tip the lter into the lower slots
16Note: While performing installations described in this book, safety glasses or goggles should be worn.For Monogram® local service in your area, call
2Safety InformationWARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:A. Use this unit only in the mann
3Design InformationPRODUCT DIMENSIONSThis vent hood is designed to be used in vented ceiling-mounted installations. It can be installed over any Mono
4ZV1050 Duct Cover Dimensions A BZV1050 11-1/2" 12"ZX1059 19"
5Advance PlanningTOOLS AND MATERIALS REQUIRED (not supplied)• Tape measure• Knife• Spirit level• Wire cutter• Wire stripper• Wire nuts• Electric drill
6Advance PlanningDUCT FITTINGS Total Equivalent Quantity Equivalent Duct Piece Dimensions Length* Used Length Round, 1 f
7Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORTPlan the locationDetermine the exact location of the vent hood.• Use a plumb bob to chec
8Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT (cont.)Align Duct to Center of CooktopCooktop OutlineTop View—Ceiling Joists Run Perpe
9Installation Instructions STEP 1 CONTINUED• Arrange cross-framing in the ceiling to suit the existing structure. See examples. – Secure each 2 x 4
Kommentare zu diesen Handbüchern