GE RAK7023 Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Nein GE RAK7023 herunter. GE RAK7023 Installation Instructions [de] [en] [fr] [it] Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 8
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Tools Needed
Phillips head screwdriver Center punch
Drill and 1/4” bit Hammer
1/4” and 5/16” Nut drivers Gloves
3. For AZ21 or AZ31 series:
a. Remove the two thumb screws securing the
transition duct to the bottom of the lateral
duct adapter.
b. Carefully slide the transition duct forward
and remove.
c. Remove room cabinet front.
4. The old transition duct, the three screws
(if used) and any gaskets used to seal the
old transition duct to the chassis will not be
needed for the new installation but should be
kept for possible reuse of the old chassis in
this installation location.
5. Remove the chassis-to-case screw (two on
each end of the chassis) and carefully slide it
from the case.
Parts Included
Transition duct assembly
Metal seal strip
Metal clips (2)
Thumb screws (2)
Important Notes
This instruction describes how to modify an
existing GE duct adapter to be used with the
new AZ45 and AZ65 Series.
Transition duct
STEP 1
Removal of the chassis from the
case
1. Disconnect the power to the unit.
2. For AZC or AZR series:
a. Remove room cabinet front.
b. Remove the three screws securing the
transition duct to the bottom of the lateral
duct adapter.
c. Carefully slide the transition duct forward
and remove (see illustration in next step).
Lateral duct adapter
6
1
»
2
7
3
»
32
Installation Instructions
for your new
Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.
RAK7023
Transitional duct adapter
Pub No. 31-30808-1 07-16 GEA
GE is a trademark of the General Electric Company. Manufactured under trademark license.
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1 - Installation Instructions

Tools Needed• Phillips head screwdriver • Center punch• Drill and 1/4” bit • Hammer• 1/4” and 5/16” Nut drivers • Gloves3. For AZ21 or AZ31 serie

Seite 2 - Chassis modification and

STEP 2 Thumb screw hole location (This step is necessary only if thumb screws were not previously used.)1. Slide the new transition duct into place.

Seite 3 - Transition duct

STEP 3 (continued)5. Reconnect power and check operation. Insure the unit is in duct mode. To do this, turn unit off. Press the red “AUX” button and p

Seite 5 - Instructions d’installation

Outils requis• Tournevis à tête cruciforme • Pointeau• Perceuse et foret de 1/4 po • Marteau• Tournevis à douille de • Gants 1/4 po et 5/6 po 3.

Seite 6 - (Cette étape est requise

ÉTAPE 2 Emplacement de trou de vis de serrage à main (Cette étape est requise uniquement si les vis de serrage à main n’ont pas été utilisées précéde

Seite 7 - Filtres à air

ÉTAPE 3 (suite)5. Rebranchez l’alimentation et vérifiez le fonctionnement. Assurez-vous que l’unité est en mode conduit. Pour ce faire, éteignez l’app

Kommentare zu diesen Handbüchern

Keine Kommentare